Video
Conservatory installation in Dublin
Watch the Conservatory designs team install a conservatory !
Energy Efficient Frame Manufacture
Content:
Overview of factory layout
First profile is cut to length
Profile is mitred, machined and drilled in one process
Profile automatically welded
Weldes cleaned, polished and machined
Opening window frames welded
Hinges and handles added
Frames ready for dispatch
Energy Efficient Glass Production
Content
Stage 1: Preparing the glass sheets for cutting
Stage 2: Cut glass sizes entering the toughening plant
Stage 3: Toughened glass ready for sealing
Stage 4: Preparing the sealing spacer bar
Stage 5: Attaching the seals
Stage 6: Applying the final seals and labels
Stage 7: into the stores ready for dispatch







